Olympic High School
School Description
  • Built in 1979
  • Addition constructed in 1990 and 1991
  • 37.09 acre site
  • Total Square Footage 185,623
  • Main Building is a single-story structure with 171,231 square feet
  • 48 Classrooms
  • Music Classrooms
  • Band
  • Choir
  • Library
  • Administration Area
  • Auto Shop
  • Art and Graphics Rooms
  • Gym and Auxiliary Gym
  • Weight Room
  • Auditorium with Stage
  • Cafeteria
  • Kitchen
  • 6 separate portables containing a total of 12,600 square feet
  • 14 Classrooms
Planned Projects and Repairs

The proposed capital projects levy includes funds for school projects and repairs across the Central Kitsap School District.

  • At Olympic High School, planned projects and repairs include:
  • Envelope Repairs
  • Exterior Window and Door Caulking
  • Seismic Repairs
  • Student Bus Pick-Up Area Reconfiguration and Drainage Repairs
  • HVAC System Repairs
  • Computer and Technology Infrastructure Replacement
  • Schedule -- Crucial elements rather than full details
Prior Improvements

Similar improvement projects were scheduled to respond to changes in local, state, and federal code requirements, ensure safety of the facility, address increasing maintenance demands, and promote a positive learning environment.

  • From 2000-2010, Olympic High School received:
  • Interior Lighting Upgraded to Energy Efficient Fixtures (2003)
  • Telephone System Replacement (2003)
  • Roof Coating (2004)
  • Exterior Stucco System Repairs and Paint (2004)
  • Pool Roof Replacement (2005)
  • Pool Repairs (2005)
  • Pool Mechanical System Upgrades (2005)
  • Science Classroom Improvements (2005)
  • Exterior Masonry System Water-Repellent Coating (2006)
  • Auditorium Improvements (2006)
  • Emergency Power System Upgrades (2007)
  • Fire Alarm System Replacement (2007)
  • Library, Pool, and Gym Lighting Upgraded to Energy Efficient Fixtures (2008)
  • Main Electrical Service Repairs (2008)
  • Carpet Replacement at Adminstration Area and Hallway Ramp (2008)
  • Concrete Walkway to Access Portables (2009)
  • Site Drainage Improvements (2009)
  • Hypalon Roof Coating (2010)
Vision

Your previous bond dollars have had a direct impact on students in the Central Kitsap School District and their learning environment. As we plan for the future, our intent is to protect our community's investment by ensuring proper maintenance and safety at each of our sites; to maximize matching funds available from the state; and to use all other funding sources to limit the financial impact on local citizens and school programs.



Thank you for your support of the Central Kitsap School District!